Grade control samples took 48+ hours under fire assay. That meant dig blocks held up and excavators walking to another area while they waited.
Tom Guy, Continuous Improvement Manager at OceanaGold's Macraes mine, on the grade control bottleneck and what changed when PhotonAssay™ went in: same-day turnaround, exploration results in four days instead of months, and enough flexibility that the mining team stopped planning around delays.
Tom also covers what the team got wrong about measuring the improvement and the one thing he'd tell other sites to prepare for.
Read the full Macraes case study: https://www.photonassay.com/resources...
Chapters
0:00 Intro
0:52 Production delays from fire assay
1:32 Evaluating PhotonAssay™
2:17 Implementing PhotonAssay™
3:53 Keeping operations moving
5:00 Quantifying the improvements
5:36 Managing the transition
6:28 A change for the industry
Definitions
CRM - Certified Reference Material
LPG - Liquefied Petroleum Gas
QC team - Quality Control team
RC rig - Reverse Circulation drill rig
HQ / NQ core - Drill core diameters; HQ is the larger, NQ the smaller.
Variability - How much results differ from each other
Representative sample - A sample that represents the larger source material it was taken from
Stopes - The underground voids left after ore is extracted
Headings - Underground tunnels driven forward to access ore
Bench turnover - Completing mining of the current pit level
Cut-off grade - The minimum gold grade at which rock is worth processing as ore
Grab samples - Spot samples taken by hand underground
Upside model - A scenario modelling a larger, longer-life mine
Re-fires - Repeating a fire assay when the first result fails quality checks
Tails grade - The small amount of gold left in residue after processing
Dig blocks - Defined volumes of ore released for excavators to mine
Grade control patterns - The planned grid of samples taken to map ore and waste before digging
Core holes - Diamond drill holes producing solid cylindrical core
Ore block - A defined volume of rock classified as ore rather than waste
Mine-to-mill reconciliation - Comparing the grade predicted by the model against what the mill actually recovered
Resource model - The estimate of how much gold is in the ground, reported to market
Aliquot - The portion of the sample actually analysed; 500g with PhotonAssay™ versus 30g with fire assay
Nameplate limit - The machine's rated maximum throughput
Grade control - Sampling during mining to decide what's ore and what's waste
Ore body - The body of mineralised rock being mined