DIY Two-Story Miniature Villa Build | Second Floor & Sloped Roof | Part 2
Buildbuilder
0:00 / 0:00
DIY Two-Story Miniature Villa Build | Second Floor & Sloped Roof | Part 2
2 493 просмотра · 2 недели назад
Buildbuilder
148 подписчиков
2 493 просмотра · 2 недели назад
Hey guys, welcome back to Buildbuilder!
In Part 2 of this miniature villa project, I continue building the second floor and take the main structure of the villa into the next stage of construction.
The episode begins with the first-floor slab, including reinforcement, lighting installation and a lighting test before the concrete pour. I then transfer the second-floor plan onto the slab and build the reinforced walls for the large upper-floor hall and bathroom.
After pouring the concrete, I remove the wall formwork and repair the unfinished and uneven areas of the walls. The upper floor then starts to take shape with wall painting, wooden flooring and finishing the wood surfaces.
Next, I tile the bathroom walls and install the exterior entrance doors for the bathroom and upper-floor hall.
The main structural feature of this part is the sloped roof. I build the roof formwork, install the reinforcement and lighting, and pour the concrete for the sloped roof sections.
Finally, I remove the roof formwork, complete the entrance connection between the flat entry section and the sloped roof, repair the unfinished concrete areas, and build the suspended staircase along the first-floor wall.
This brings Part 2 to the next stage of the build. In Part 3, I will continue with the exterior details, landscaping and final finishing touches to complete the miniature villa.
If you enjoy miniature construction, architectural models and detailed DIY building projects, don't forget to like, subscribe and follow Buildbuilder for the final part.
00:00 Project Preview
00:49 First Floor Slab, Reinforcement & Lighting Installation
02:40 Drawing & Marking the Second Floor Plan
03:40 Upper Floor Wall Formwork & Reinforcement
05:16 Concrete Pouring, Formwork Removal & Wall Repairs
06:46 Painting the Upper Floor Walls
07:55 Wooden Flooring & Wood Finishing
09:26 Bathroom Tiling & Exterior Door Installation
10:19 Sloped Roof Formwork, Reinforcement & Concrete Pouring
13:23 Roof Finishing, Entrance Connection & Suspended Staircase
16:02 Coming Up – Part 3
Song: Breakfast in Vegas
Music by: CreatorMix.com
Song: Coastline.mp3
Music by: CreatorMix.com
Song: Higher Ground.mp3
Music by: CreatorMix.com
Song: City Lights.mp3
Music by: CreatorMix.com
Song: South Beach Heat.mp3
Music by: CreatorMix.com
Song: The Informant.mp3
Music by: CreatorMix.com
Song: Neon Sunsets.mp3
Music by: CreatorMix.com
Song: In the Dark.mp3
Music by: CreatorMix.com
#Reinforcement #Miniature Building #DIY Build,#Buildbuilder #Miniature Construction #Model Making #Architecture #Time-Lapse
#Mini Villa #Wooden Flooring #Concrete Pouring #Lighting Installation #MiniatureVilla #DIY