Перейти к содержимому

Project Yak 5.1 - Indrawati River

benaquarium

0:00 / 0:00

Project Yak 5.1 - Indrawati River

48 просмотров · 12 дн. назад
benaquarium
6 подписчиков
48 просмотров · 12 дн. назад
River: Indrawati River Put in: Bridge on Indrawati River Take out: Confluence of Indrawati and Sunkosh Rivers Class: II/II+ Date of run: 05/10/2026 Distance: 26.82km Some quick cuts. Featuring a continuous run at the Indrawati. Pre-lunch sections featured fun, wide wave-trains in a wide river. Occasional shallower sections. Post-lunch featured a lazy river section. The Indrawati is a mostly chill river with occasional surprises. Special thanks to Nepal River Runner and team for guiding us through :) Timestamps: 00:00 Put in 02:23 Launch, Run 1 05:58 Run 2 (08:30 Cap lol) 09:53 Break 11:40 Run 3 into shallow section, several rapids 32:56 Run 4 39:40 Hands to lunch 40:00 Run 5 (post-lunch), enjoying the open views of the river basin 43:35 Run 6