Перейти к содержимому

Rain and Wind Build Over the Öresund — Malmö & Hyllie at Sunset

Öresund Bridge Timelapses

0:00 / 0:00

Rain and Wind Build Over the Öresund — Malmö & Hyllie at Sunset

5 просмотров · 2 нед. назад
Öresund Bridge Timelapses
45 подписчиков
5 просмотров · 2 нед. назад
Rain moves in over the strait as evening settles, with Malmö and Hyllie silhouetted across the water in the distance. Drizzle gives way to full overcast between 16:32 and 20:44, the air cooling into the low teens while gusts push past 45 km/h — a blustery, rain-soaked sunset on the Swedish side of the Øresund. The water stays mild (slight, 0.4–0.7 m), but the sea level sits 24–32 cm above normal and falling. Several vessels passed nearby through the main channel during the window — a pilot boat, the cargo ship Equinox Orenda bound for a Russian port, and the passenger ferry Finnswan between Sweden and Germany — though the main shipping lane is a known blind spot for these cameras, so don't count on spotting them on screen. On the air-traffic side, Sturup (Malmö Airport) saw a steady run of arrivals and departures to Stockholm and beyond: among them SAS's SK2113 in from Stockholm Arlanda (around 17:00, running a bit late) and the Windrose W64291 arriving from Tuzla near 20:00. The video carries a timestamp overlay, so you can scrub to near a flight's time and try to catch it overhead. It's road-work season on the bridge itself: expansion joints are being replaced through late October, and the High Bridge is under a lane closure (both directions, expected until around 19 Oct) with reduced speed and restrictions on the widest and heaviest vehicles. Set to a dramatic score, it's a moody, moving look at the crossing at dusk. Captured 2026-10-08 16:32–20:44 local time. 15,000 frames (4.2 real hours) compressed into 4.2 minutes — roughly 60x speed. Temperature ranged 11°C to 13°C. Wind: 38–45 km/h. Sea state: Slight (0.4–0.7 m waves). Sea level (Drogden): 24–32 cm above normal, falling. Conditions through the window: 17:00 Drizzle → 18:00 Overcast. 🚢 Maritime traffic nearby during this window: PILOT 211 SE (Unknown), EQUINOX ORENDA (Cargo → RU LED), FINNSWAN (Passenger → SEMMA‹›DETRV). ✈️ Flights at Sturup (Malmö) during this window (match against the video's timestamp to spot them): FT679 landing ~17:05 (Stockholm BMA) [Arrives 17:10], SK2113 landing ~17:00 (Stockholm ARN) [Arrives 17:28], FT681 landing ~18:35 (Stockholm BMA) [Arrives 18:41], SK121 landing ~19:10 (Stockholm ARN) [Arrives 19:07], W64291 landing ~19:55 (Tuzla) [Arrives 19:41], FT685 landing ~20:05 (Stockholm BMA) [Arrives 20:27], FT684 departing ~17:30 (Stockholm BMA), SK2114 departing ~17:30 (Stockholm ARN) [Delayed until 18:00Gate closed], FT686 departing ~19:00 (Stockholm BMA), SK126 departing ~19:40 (Stockholm ARN) [Gate closed], W64292 departing ~20:30 (Tuzla) [Gate closed]. 🚧 Road work (Lane closure) at The High Bridge, Both directions - expected until 2026-10-19T21:59:00Z UTC. SV: Hastigheten är nedsatt genom arbetsområdet. Breda fordon (över 3,75 meter) och tunga transporter (över 100 ton) kan inte passera förbindelsen under arbetet. Tågtrafiken påverkas inte och kör som vanligt. Vi beklagar besväret och tackar för förståelsen. --- ENG: Speed is reduced through the work zone. Wide vehicles (over 3.75 metres) and heavy transports (over 100 tonnes) cannot use the crossing during the works. Rail traffic is not affected and runs as normal. We apologise for any inconvenience and thank you for your understanding. --- DK: Hastigheden er nedsat ved arbejdsområdet. Brede køretøjer (over 3,75 meter) og tunge transporter (over 100 ton) kan ikke passere forbindelsen under arbejdet. Togtrafikken påvirkes ikke og kører som normalt. Vi beklager ulejligheden og takker for forståelsen. ℹ️ Bridge status notice(s): Replacement of expansion joints until the end of October — Two of Øresundsbron's largest expansion joints are being replaced simultaneously – a solution that shortens the total project time by a full year. The work is planned to affect road traffic as little as possible.... | Øresundsmotorvejen is being expanded — Øresundsmotorvejen will be expanded over the coming years to improve traffic flow, which today is often characterised by extensive queues and congestion during rush hours.... 🎵 Music: "Love and Marriage" by Jeremy Black (YouTube Audio Library) 🎵 Music: "Milky Way" by Ramzoid (YouTube Audio Library)