No fast cuts.
No music.
No yelling.
Just 4 hours of real fabrication while building the Dad Drift Kart.
Late nights in the garage, welding, machining, problem solving, assembly, and workshop atmosphere.
I wanted this to feel slower and more immersive than modern content. Something you can throw on while working, building, studying, relaxing, or falling asleep.
This is the real process behind the Dad Drift Kart project.
CAD files, build packs and project updates:
https://cruddcnc.com/?src=video
0:00 Intro
0:10 Bending and coping frame tubes
16:00 Lathe work - modifying tubes for bearings
24:00 Mocking up knuckle geometry
26:00 More tube cutting and coping
30:00 Compound bends for bash bars
37:00 Opposite side bash bar fabrication
41:00 Engine mounting and mock up
45:00 Front bull bar fabrication
50:00 Fabricating the seat stay
1:03:00 Engine bash bar
1:09:00 Seat mount brackets (the fail)
1:16:00 Seat mount fabrication
1:17:00 Rear axle bearing mounts
1:31:00 Laser welding the knuckles
1:38:00 Welding knuckles to frame
1:48:00 Engine mounting plate
1:59:00 CNC milling the rear axle keyway
2:02:00 Rear brake caliper mount
2:07:00 Laser cutting the mid plate
2:09:00 Welding axles and brake brackets
2:12:00 Knuckle spacers on the lathe
2:14:00 Installing steering components
2:15:00 Steering column support
2:17:00 Foot plate and steering bearing
2:18:00 First time sitting in the kart
2:19:00 Steering arm and tie rods
2:20:00 CNC machining steering wheel adapter
2:29:00 Installing the steering wheel
2:32:00 Brake and accelerator pedal
2:33:00 Engine install and brake fitting drama
2:34:00 Front wheel hubs
2:36:00 Hand brake and front brake calipers
2:39:00 Geometry issue - cutting off front knuckles
2:42:00 Refit correct geometry and verify ride height
2:43:00 Front brake master cylinder (first attempt)
2:47:00 Front brake master cylinder (actually works)
2:51:00 Strip back for finish welding
2:53:00 Finish laser welding the entire frame
3:19:00 Full reassembly
3:25:00 Front brakes and bash bars
3:29:00 Disassembly for finishing
3:33:00 Clean and sand frame
3:40:00 Weld in tube plugs
3:45:00 Clean and paint
3:52:00 Underbody LED install
3:54:00 Full reassembly
4:13:00 First drive!
#ASMR #Fabrication #GoKart #GarageBuild #slowtv
---
CAD files, drawings and BOM for the kart: https://cruddcnc.com/?src=video
THE DAD DRIFT KART SERIES
Part 1, Frame and CAD: • I Built a Drift Kart From Scratch in My Ga...
Part 2, Steering, pedals, on the ground: • This Turned Out Better Than I Expected | D...
Part 3, First drive: • First Drive in the Drift Kart I Built From...
Slow Garage TV, 4 hours of the build, no talking: • 4 Hours Welding a Drift Kart Frame, No Tal...
3D model of every part, spin it and blow it apart: https://cruddcnc.com/?src=video