Перейти к содержимому

BRAND NEW HUGE KONE S MonoSpace Traction Elevators At Keppel MRT Station [To Bicycle Parking Area]

SG3251K Transportations

0:00 / 0:00

BRAND NEW HUGE KONE S MonoSpace Traction Elevators At Keppel MRT Station [To Bicycle Parking Area]

105 просмотров · 2 мес. назад
SG3251K Transportations
1,21 тыс. подписчиков
105 просмотров · 2 мес. назад
Date Filmed: 6 August 2026 So As The Circle Line Stage 6 Have Made Into It's Passenger Service, I Wanted To Actually Decided To Explore The Circle Line Stage 6 Section Design But Due To The Staff and Guards In The Ticket Gates, I Decided To Only Filmed The Elevators Since When I Explore The New Areas, I Might Get Stopped By The Recording Due To Some Safety Reason and Concern About What Happened. But To Not Feel Bad About It, I Have More Things To Show Out. Since The Circle Line Stage 6 Has Finally Opened, The Circle Line Has Finally Become The Real Circle. So To Celebrate It Off, I Have Choosen To Visit Keppel MRT Station Which Keppel MRT Station Is One Of The 3 MRT Stations Which Is Currently The Newest Of All But Also One Of The Newest MRT Projects Which Were Ongoing So Far To Bring More Connection and Travel Shorter Times To Reach To Another Destination As Fast As Possible. The Station Of Keppel Begin Operation Since 12 July 2026 As The Section Was Originally Supposed To Be Opened In 2025 But Was Delay To 2026 Due To The Covid-19. But As The Area Opened, The MRT Station Keppel Was Not Very Crowded At That Moment Since I Was Guessing That I Came Here During The Off-Peak Period Since I Do Not Wish To Come In The Evening Peak If Not It Would Be Difficult To Filmed The Elevators/Lifts. In 2017, The Construction Of The Keppel MRT Station Begin In The End Of 2017. It Look Very Long Time To Make The New MRT Station Because To Connect The TBM To The Existing Harbourfront MRT Station and To The Other New Cantonment MRT Station. The New Keppel MRT Station Features 3 Exits & 1 Bicycle Parking Space Which Is Now Being Operated Underground At The Basement 1 Floor. I Write This Since I Read It On The Internet. When The Keppel MRT Was First Said In 2015, The MRT Station Would Be Located Near The Future Greater Southern Waterfront Area. This Was One Of The Three MRT Station That The Land Transport & Authority Said That It Will Complete The Circle To Become The Real Circle. Last Time, The Train Wasn't Full Complete As The Tunnel Works Were Completed and Breakthrough In Early-2022 Which After That Install The Equipments Inside. The New Circle Line Stage 6 Would Feature New KONE Elevators, Which Would Help To Ensure To Have Bigger Buttons For The People Who Needed The Elevator More. The KONE Elevators Were Also Being Installed With Cantonment MRT & Prince Edward Road MRT Which Would Be Use In Another Video In Order To Save The Storage For Some Reason. The Escalators Would Also Be Operated By KONE As Well But I Didn't Filmed It Because Lift Is More Interesting. One Thing That I Have Noticed Is That The KONE Elevator Have Decided To Said The AI Version Like: "Please Give Way To Those In Need." Instead Of "Show Your Care By Giving Way To The Elderly, Or Parents With Young Children Who Need The Lift More. A Little Consideration Makes A Difference." Everytime When I Pressed The Call Button After The Button Sound Got Beep When I Was About To Ride The Elevators Along The MRT Station. Before Actually The New CCL6 Stations Were Being Opened, The Previous MRT Station To Open Was Hume MRT Station Which Was Opened For About One Year and More Then That Already As The Time Passes Too Fast. But Now Back To The Keppel MRT Station, The Keppel MRT Station Features The Exhibition Centre At The B1 That Also Have The Tunnel Boring Machine That Was Used To Excavate The CCL Station and Tunnels. At The Platform Section Of The Elevator, The Elevator Was Then Being Installed At The Both End Of The Platform, Maybe Due To The Platform Design. The Platform Is Located At The B2 Floor While The Ticket Hall Is At The B1 Floor. The Floor B1 Is Also Feature With The Underground Bicycle Parking While The First Floor Serves The Exit 1, 2 & 3. At That Time, The Bicycle Elevator Has Bigger Capacity. ↓Lift Information↓ Brand: KONE Model: S MonoSpace Capacity: 26 persons 2175 kg Floor served: B1 and L1 Year Installed: 2026? Year Replaced: N/A Announcement: Yes Chime: Yes History: Original Rating: 100+/100 Please do not Upload or use my videos without any permission, As well as Reporting my channel and any of my videos. Also Please don't dislike and No writing any hate comments! Any Hate comments will be removed at any time. Elevator Filming is not a crime! Recorded Using Vivo Y38