[FULL ROUTE, 4K] O-Train - Line 2 “Trillium” Southbound (Stadler Rail FLIRT C12)
MiRide
0:00 / 0:00
[FULL ROUTE, 4K] O-Train - Line 2 “Trillium” Southbound (Stadler Rail FLIRT C12)
1 127 просмотров · 1 год назад
MiRide
792 подписчика
1 127 просмотров · 1 год назад
C12 is part of a seven diesel-electric multiple unit (DEMU) order that was ordered as part of the Stage 2 South extension, being ordered as fleet expansion units for the reopening of Line 2 "Trillium" that finally happened on January 6th, 2025. They can be found exclusively on O-Train's Line 2 "Trillium."
This ride was recorded in 4K on April 21st, 2025 on an iPhone 15 Pro.
( VEHICLE SPECIFICATIONS )
Model: Stadler Rail FLIRT
Years of Manufacture: 2021
Operator: OC Transpo
Engine: 4x Deutz TCD 16.0 (700hp per engine)
Transmission: 4x TSA AC traction motors (with ABB IGBT-VVVF controllers)
( FULL PLAYLIST )
• Ottawa-Carleton Regional Transit Commission
( SOCIAL MEDIA )
All official MiRide social media outlets are found at the bottom of the MiRide Carrd.
Carrd: https://miride.carrd.co/
MiRide is a Greeism Subdivision, dedicated to Canadian transit content.
#Line2 #Trillium #OCTranspo