Перейти к содержимому

Building the Original Trans-Grand Canyon Water Pipeline 1965-1970

Grand Canyon History

0:00 / 0:00

Building the Original Trans-Grand Canyon Water Pipeline 1965-1970

53 953 просмотра · 9 дней назад
Grand Canyon History
2,62 тыс. подписчиков
53 953 просмотра · 9 дней назад
This video recounts the remarkable history and engineering challenges behind the construction of the Inner Trans Canyon Pipeline in the Grand Canyon, a vital water supply system for both the North and South Rims. It details the ambitious mid-20th-century project to build a 13.4-mile pipeline across challenging terrain, and the extreme difficulties faced—including dangerous helicopter operations, devastating floods, and seven deaths. Timeline Summary *00:00 - 02:28: Water Challenges at Grand Canyon Village* Overview of early water scarcity problems on both rims of the Grand Canyon and initial solutions such as hauling water and early pumping efforts. *02:29 - 04:10: The Plan and Pipeline Route* Introduction of the 1963 pipeline plan from Roaring Springs to the South Rim, its technical details, water flow changes in elevation, and environmental restrictions for the construction footprint. *04:11 - 06:20: Construction Begins and Operational Difficulties* Description of the construction camp setup, the use of helicopters instead of mules, extreme working conditions, and the challenges of trenching the line through solid rock by hand and small machinery. *06:21 - 08:30: Pipeline Laying and Safety Challenges* Details of the pipe bending and welding process, hazardous helicopter operations transporting pipe segments, and a tragic helicopter crash killing a pilot. *08:31 - 10:52: Bridge Construction and Catastrophic Flood* Construction of a new silver bridge for the pipeline crossing, followed by a massive flood that destroyed large sections of the pipeline and trail, leading to the termination of work and financial crisis. *10:53 - 13:37: Disaster Aftermath and Helicopter Crash* Inspection flights uncover widespread destruction, and the pilot, Elling Halverson, experiences a life-threatening helicopter crash; pipeline reconstruction delays due to legal and funding issues. *13:38 - 15:41: Pipeline Reconstruction and Further Accidents* Work resumes with heavier machinery allowed, trail reroutes for safety, and additional deadly helicopter crashes claimed lives among pilots and crew. *15:42 - 16:55: Project Completion and Legacy* Final inspections, dedication ceremony, project cost and recognition as the largest helicopter job of its time, capability of pipeline output, and acknowledgment of the human and technical effort behind the pipeline.