Edmonton's NEW 50th Street Overpass Tour (Railway Grade Separation)
Urban Motion
0:00 / 0:00
Edmonton's NEW 50th Street Overpass Tour (Railway Grade Separation)
6 518 просмотров · 9 месяцев назад
Urban Motion
3,07 тыс. подписчиков
6 518 просмотров · 9 месяцев назад
After years of planning and construction, the 50th Street Widening and Railway Grade Separation project is progressing. This driving tour takes you through one of Edmonton's most significant recent infrastructure upgrades.
Video Highlights Include:
Grade Separation: A detailed look at the new structure that finally separates vehicle traffic from the CNR/CPKC mainline, eliminating major delays.
Increased Capacity: Experience driving on the new overpass, now featuring three lanes of vehicle traffic in both the North and South directions.
Pathways for All: Check out the new amenities for active transportation, including the wide Shared Use Path on the east side for cyclists and walkers, and the traditional sidewalk on the west side.
This video gives you a ground-level look at how the City of Edmonton is improving travel and connectivity in the southeast.
Don't forget to comment and subscribe for more content!
#yeg #edmonton #construction #infrastructure #cprail
Chapters:
0:00 Intro
0:10 Background
1:07 Tour
7:55 Outro
Thanks for watching, and until next time STAY IN MOTION my friends!!
🔔 Subscribe to Urban Motion for more deep dives into Edmonton transit, infrastructure, and city building: @urban_motionX
🛒 SHOP MY RIDING GEAR & CAMERA SETUP
Looking for the helmets, riding gear, and tech I use to shoot my videos?
Check out my official Amazon Storefront:
👉 https://www.amazon.com/shop/urbanmotion
As an Amazon Influencer, I earn from qualifying purchases
📦 Media & Press Use: All original transit and infrastructure B-roll footage in this video is available for educational/documentary reuse with on-screen credit to @Urban_MotionX