Перейти к содержимому

Saudi Arabia's $1.9B Tower Froze at 63 Floors for 7 Years

The Engineering Casebook

0:00 / 0:00

Saudi Arabia's $1.9B Tower Froze at 63 Floors for 7 Years

16 просмотров · 2 нед. назад
The Engineering Casebook
1 подписчик
16 просмотров · 2 нед. назад
Saudi Arabia's $1.9B Jeddah Tower froze at 63 floors for 7 years—leaving a bare concrete core open to Red Sea salt. Now rising again, will it reach 1,000m? WHAT'S IN THIS VIDEO: The engineering battle against four enemies: no bedrock (270 bored piles in coral limestone), Red Sea salt, wind vortex shedding, and extreme pumping height. The financial loop: how a $1.2B (SAR 4.6B) contract in 2011 led to a $174M bond call in 2023—and why the same builder was rehired for $1.9B (SAR 7.2B) in 2024. The 2018 halt at 63 floors (256 meters) and where the official record splits on what stopped the world's tallest building. The central forensic gap: 7 years of stillness in desert heat and coastal humidity with zero published structural assessments of the dormant core or its cold joint. The 2025–2026 restart: climbing at one floor every five days toward 116 floors (466 meters), and why the late 2028 target remains an open question. CHAPTERS: 00:00 Act 0 — Cold Open: The Contradiction (1,000m Promise vs. 7 Years of Stillness) 01:45 Act 1 — The Vision: From the Mile-High Dream to the 1,000m Contract 04:10 Act 2 — The Four Enemies: Ground, Wind, Salt, and Height 07:35 Act 3 — The Money Beat: The $1.2B Bargain to the $1.9B Rehire Loop 10:20 Act 4 — The Halt: January 2018 and Where the Sources Split 13:05 Act 5 — The Disconnect: Paper Promises vs. the 7-Year Unassessed Core 15:40 Act 6 — The Restart: Five Days a Floor and the 2028 Question 18:30 Act 7 — The Verdict: Closing the Ledger on an Unfinished Climb AI DISCLOSURE: Visuals in this video are AI-reconstructed dramatizations based on documented sources. All figures, dates, and claims come from the sources below. Narration is human-recorded. SOURCES: "Construction of World's Tallest Building to Resume With New $1.9B Contract" — Engineering News-Record (ENR) "Contractor appointed to complete world's tallest tower" — MEED "Work continues on world's tallest tower after Saudi corruption purge" — Gulf Business (Reuters-derived, Jan 2018) "Jeddah Tower targets late 2028 completion" — Gulf Business (Oct 2026) "World's tallest tower reaches 370m" — Construction Week Online (Mar 2026) "Jeddah Tower Project Page" — Thornton Tomasetti CNN-derived reporting on the 2018 halt and COVID restart delay Jeddah Tower orientation records — Wikipedia #JeddahTower #Megaprojects #1Point9Billion #SkyscraperEngineering #SaudiVision2030 Tags: Jeddah Tower, Kingdom Tower, Jeddah Tower construction update, Jeddah Tower 2026, $1.9B skyscraper, Saudi Arabia megaprojects, world's tallest building, 1000m tower, Adrian Smith Gordon Gill, Thornton Tomasetti, Saudi Binladin Group, Jeddah Economic Company, megaproject failures, forensic engineering audit, supertall skyscraper, Burj Khalifa vs Jeddah Tower, construction documentary