Перейти к содержимому

New Ravi Bridge Lahore | 2,400-Ton Pile Load Test Begins

Vlogger Khalid

0:00 / 0:00

New Ravi Bridge Lahore | 2,400-Ton Pile Load Test Begins

9 824 просмотра · 1 дн. назад
Vlogger Khalid
19 тыс. подписчиков
9 824 просмотра · 1 дн. назад
New Ravi Bridge Lahore | 2,400-Ton Pile Load Test Begins New Ravi Bridge Lahore — watch the latest ground visit to this important Ravi River infrastructure project, where pile-load testing is reported to be underway with a 2,400-tonne load. In this video, Vlogger Khalid visits the New Ravi Bridge, which is intended to connect RUDA Package 7 with Package 8 and provide a connection toward Jahangir’s Tomb. We explore the visible construction progress, pile testing, the planned traffic connection, and pedestrian walkways reported to be around 6 feet wide on both sides. 📍 In this video: New Ravi Bridge Lahore site visit Connection between RUDA Package 7 and Package 8 Planned road connection toward Jahangir’s Tomb Pile-load testing at the bridge site Reported 2,400-tonne test load Pedestrian walkways planned on both sides Latest visible construction progress and infrastructure details Why is pile testing important in bridge construction? What does a pile-load test tell engineers about a bridge foundation? Watch the full video for on-site observations and a closer look at this developing project. 👍 Like the video if you enjoy Lahore infrastructure updates. 💬 Comment below: What impact could the New Ravi Bridge have on traffic around this area? 📲 Share this video with friends interested in Lahore development. 🔔 Subscribe to Vlogger Khalid for more bridge projects, road construction, railway updates, and ground visits across Pakistan. Disclaimer: This video presents observations recorded during the site visit. The 2,400-tonne load, pedestrian walkway dimensions, and intended connections are based on the information available for this video and have not been independently verified here. The final design, route, and opening date should be confirmed through official project information. #NewRaviBridge #RaviRiverBridge #RUDA #RUDAPackage7 #RUDAPackage8 #JahangirsTomb #PileLoadTest #BridgeConstruction #LahoreInfrastructure #VloggerKhalid