(Cab Ride 57 ) Churchyard Sidings to Acton Central, Part Three, A Freight Rambler Production.
Freight Rambler
0:00 / 0:00
(Cab Ride 57 ) Churchyard Sidings to Acton Central, Part Three, A Freight Rambler Production.
1 636 просмотров · 6 лет назад
Freight Rambler
4,2 тыс. подписчиков
1 636 просмотров · 6 лет назад
At the start of Part Three of our trip from Churchyard Sidings, St Pancras to Acton Central ( the final destination was Hither Green Sidings ) we are stood at signal DH12 on the Down Cricklewood, i have been contacted by the Signaller, who has advised me that i can pass DH12 at Danger, the signal is passed & i continue up to Neasden Junction, we pass Neasden Junction Signal Box on our right, we then continue onto the approach to Acton Canal Wharf Signal Box, there are 20 wagons in the train, the length is 314 metres, the weight is 1075 tonnes, max speed is 60 mph, continued in Part Four