Перейти к содержимому

Earthwork Calculation Of A Road By Using Mean Area Method-2 || Lecture 33 || Aditya Agrawal

Aditya Agrawal: A Civil Engineer

0:00 / 0:00

Earthwork Calculation Of A Road By Using Mean Area Method-2 || Lecture 33 || Aditya Agrawal

6 892 просмотра · 3 г. назад
Aditya Agrawal: A Civil Engineer
1,58 тыс. подписчиков
6 892 просмотра · 3 г. назад
#meanareamethod #roadworkestimation #adityaagrawal Cross section of earthwork of road in banking or in cutting is usually in the form of trapezium, and the quantity of earthwork may be calculated by the following methods: 1) Mid-Sectional Area Method 2) Mean Sectional Area Method 3) Prismoidal Area Method Quantity or Volume = Sectional Area * Length This Video includes the concept of Area Slope Method with a simple basic numerical on estimation which means to calculate the overall work of quantity (including Banking & Cutting) of excavation. यह वीडियो हमें रोडवर्क अनुमान निर्धारित करने में मदद करता है। इसकी मदद से हम आसानी से कटिंग और आवश्यक बैंकिंग की मात्रा का पता लगा सकते हैं। सड़क कार्य के आकलन को निर्धारित करने के लिए हम आम तौर पर 3 विधि पसंद करते हैं: 1) मध्य-अनुभागीय क्षेत्र मथोड़ 2) माध्य अनुभागीय क्षेत्र विधि 3) प्रिज्मोइडल क्षेत्र विधि Method of Mid Sectional Area Method 1)    • Видео   2)    • Видео   3)    • Видео   4)    • Видео   Method of Mean Sectional Area Method 1)    • Видео   2)    • Видео   3)    • Видео   Method of Prismoidal Formula Area Method 1)    • Видео   2)    • Видео   Initial Video of the topic Introduction of Road Work Excavation:    • Видео   If any Query or Suggestion put it in the comment box. Thank You..... Prof. Aditya Agrawal Email Id: indorecivilengineer@gmail.com aditya agrawal, Earthwork by Mid Area Method, Earthwork by Mean Area Method, Earthwork by prismoidal Area Method, earthwork quantity of road, quantity of earthwork for road, calculate quantity of earthwork for road, earthwork calculations for road works, earthwork calculation in surveying, earthwork calculations for road and canals, earthwork in road construction, how to calculate earthwork excavation quantity, how to calculate earthwork volume, calculation of earthwork for road, Earthwork by Mean Area Method, Quantity Survey, earthwork calculations, aditya agrawal, Earthwork by Mid Area Method, Earthwork by Mean Area Method, Earthwork by prismoidal Area Method, earthwork quantity of road, quantity of earthwork for road, calculate quantity of earthwork for road, earthwork calculations for road works, earthwork calculation in surveying, earthwork calculations for road and canals, earthwork in road construction, how to calculate earthwork excavation quantity, how to calculate earthwork volume, calculation of earthwork for road, Earthwork by Mean Area Method, Quantity Survey, earthwork calculations, आदित्य अग्रवाल, माध्य क्षेत्र विधि द्वारा मिट्टी का काम, मध्य क्षेत्र विधि द्वारा मिट्टी का काम, प्रिज्मॉइडल एरिया मेथड द्वारा अर्थवर्क, सड़क की मिट्टी की मात्रा, सड़क के लिए मिट्टी के काम की मात्रा, सड़क के लिए मिट्टी के काम की मात्रा की गणना करें, सड़क कार्यों के लिए मिट्टी की गणना, सर्वेक्षण में मिट्टी की गणना, सड़क और नहरों के लिए मिट्टी की गणना, सड़क निर्माण में मिट्टी का काम, मिट्टी की खुदाई की मात्रा की गणना कैसे करें, भूकंप की मात्रा की गणना कैसे करें, सड़क के लिए मिट्टी के काम की गणना, मीन एरिया मेथड द्वारा अर्थवर्क, मात्रात्मक निरीक्षण, मिट्टी की गणना, आदित्य अग्रवाल, माध्य क्षेत्र विधि द्वारा मिट्टी का काम, मध्य क्षेत्र विधि द्वारा मिट्टी का काम, प्रिज्मॉइडल एरिया मेथड द्वारा अर्थवर्क, सड़क की मिट्टी की मात्रा, सड़क के लिए मिट्टी के काम की मात्रा, सड़क के लिए मिट्टी के काम की मात्रा की गणना करें, सड़क कार्यों के लिए मिट्टी की गणना, सर्वेक्षण में मिट्टी की गणना, सड़क और नहरों के लिए मिट्टी की गणना, सड़क निर्माण में मिट्टी का काम, मिट्टी की खुदाई की मात्रा की गणना कैसे करें, भूकंप की मात्रा की गणना कैसे करें, सड़क के लिए मिट्टी के काम की गणना, मीन एरिया मेथड द्वारा अर्थवर्क, मात्रात्मक निरीक्षण, मिट्टी की गणना,