Перейти к содержимому

🚧 Road work on Öresund Bridge Pylon East — 2026-09-19

Öresund Bridge Timelapses

0:00 / 0:00

🚧 Road work on Öresund Bridge Pylon East — 2026-09-19

27 просмотров · 4 дня назад
Öresund Bridge Timelapses
20 подписчиков
27 просмотров · 4 дня назад
The Pylon East webcam's latest automated timelapse of the Öresund Bridge. This camera faces toward Malmö and Hyllie on the Swedish side of the strait. Captured 2026-09-19 05:24–07:45 local time. 8,373 frames (2.3 real hours) compressed into 5.6 minutes — roughly 25x speed. Temperature: steady around 15°C. Wind: 34–39 km/h. Sea state: Moderate (~0.9 m waves). Water level (Drogden): 24–27 cm. Conditions: Overcast throughout. 🚢 Maritime traffic nearby during this window: FINNTRADER (Passenger → PLSWI), FINNFELLOW (Passenger → SEMMA‹›DETRV). ✈️ Flights at Sturup (Malmö) during this window (match against the video's timestamp to spot them): DK1475 landing ~01:10 (Palma) [Arrives 01:00], SK105 landing ~08:10 (Stockholm ARN) [Arrives 08:06], W64291 landing ~08:25 (Tuzla) [Arrives 08:17], W64711 landing ~08:25 (Skopje) [ApproachArrives 08:13], DK1433 landing ~15:00 (Palma), SK109 landing ~15:45 (Stockholm ARN), FR5696 landing ~17:10 (London STN), W45195 landing ~22:25 (Tirana), DK1432 departing ~07:40 (Palma) [Gate closed], SK106 departing ~08:40 (Stockholm ARN) [Gate closed], W64292 departing ~09:10 (Tuzla) [Gate closed], W64712 departing ~09:10 (Skopje) [Gate closed], SK110 departing ~16:15 (Stockholm ARN), DK806 departing ~16:30 (Antalya), FR5695 departing ~17:35 (London STN), W45196 departing ~23:00 (Tirana). 🚧 Road work (Lane closure) at The High Bridge, Both directions - expected until 2026-10-19T21:59:00Z UTC. SV: Hastigheten är nedsatt genom arbetsområdet. Breda fordon (över 3,75 meter) och tunga transporter (över 100 ton) kan inte passera förbindelsen under arbetet. Tågtrafiken påverkas inte och kör som vanligt. Vi beklagar besväret och tackar för förståelsen. --- ENG: Speed is reduced through the work zone. Wide vehicles (over 3.75 metres) and heavy transports (over 100 tonnes) cannot use the crossing during the works. Rail traffic is not affected and runs as normal. We apologise for any inconvenience and thank you for your understanding. --- DK: Hastigheden er nedsat ved arbejdsområdet. Brede køretøjer (over 3,75 meter) og tunge transporter (over 100 ton) kan ikke passere forbindelsen under arbejdet. Togtrafikken påvirkes ikke og kører som normalt. Vi beklager ulejligheden og takker for forståelsen. ℹ️ Bridge status notice(s): Replacement of expansion joints until the end of October — Two of Øresundsbron's largest expansion joints are being replaced simultaneously – a solution that shortens the total project time by a full year. The work is planned to affect road traffic as little as possible.... | Emergency Exercise on Øresundsbron 1/10 at 20:00–23:15 — Øresundsbron will be closed to motorway traffic in both directions on October 1, 2026 from 20:00 to 23:15 due to a full-scale emergency exercise. Øresund train services will run as normal. The exercise is a central element of the cross-border emergency preparedness work on the fixed link. | Øresundsmotorvejen is being expanded — Øresundsmotorvejen will be expanded over the coming years to improve traffic flow, which today is often characterised by extensive queues and congestion during rush hours.... 🎵 Music: I Am a Man Who Will Fight for Your Honor by Chris Zabriskie is licensed under a Creative Commons Attribution 4.0 license. Source: http://chriszabriskie.com/honor/ Artist: http://chriszabriskie.com/