High Voltage Upgrade Without a Shutdown | Huon Aquaculture Case Study
Enginuity Power Solutions
0:00 / 0:00
High Voltage Upgrade Without a Shutdown | Huon Aquaculture Case Study
48 просмотров · 7 дн. назад
Enginuity Power Solutions
19 подписчиков
48 просмотров · 7 дн. назад
See how Enginuity Power Solutions helped Huon Aquaculture avoid a shutdown and modernise its pump station and high voltage network at Parramatta Creek, Tasmania.
Have you got ageing equipment, manual processes or a power system you can't afford to switch off? In this video, Tom Green, Managing Director of Enginuity Power Solutions, speaks with Pete Dutton, Maintenance Planner at Huon Aquaculture, on site at Parramatta Creek about how a water pump project grew into a long-term partnership.
What you'll see in this video:
• A manual pump start-up, which meant a 20 to 25 minute drive and 15 to 20 steps by hand, replaced with automated valves, a variable speed drive and remote telemetry
• 1970s switchgear and exposed busbars replaced with safer, modern high voltage (HV) and low voltage (LV) switchgear, plus a dedicated generator changeover
• Power quality improved with Static Var Generators, so the plant could run on one transformer and nothing had to be shut down
• Lower site demand and a return on investment on top of the safety and reliability gains
Read the full story: https://enginuityps.com.au/news/upgra...
Talk to Enginuity Power Solutions about your site: https://enginuityps.com.au/contact/ | (03) 6709 8070
About Enginuity Power Solutions: A leader in Australia's electrical services industry, distinguished by its energy efficiency-first approach to engineering innovative power solutions.
#HighVoltage #PowerQuality #ElectricalEngineering #Tasmania #EnergyEfficiency