Utah Olympic Park Game Changer Lift (Full Loop)
Skiliftguy Erik Sahlin
0:00 / 0:00
Utah Olympic Park Game Changer Lift (Full Loop)
128 просмотров · 3 дня назад
Skiliftguy Erik Sahlin
274 подписчика
128 просмотров · 3 дня назад
The Game Changer was part of an expansion by Utah Olympic Park in 2022. However, due to that record year in lift construction, that all affected the supply chain. This Doppelmayr UNI-G wasn’t really completed until February or March of 2023 therefore. Unlike other lifts at the park, this one is only open to ski training athletes in the winter, with around 3 runs being dedicated slalom courses. This is its first time running in a season other than winter, that being the fall. Game Changer’s vertical and length are surprisingly long and high for it only having 10 towers. 2 of them are European Style with Tower 1 being Canadian. This lift operates pretty slow for a detachable in the summer compared to others like in Deer Valley, Snowbird or even Brighton. Because of how it operates, Game Changer is gonna last a long time to train generations of future Olympians abroad.
Capacity: 2,400 per hour
Ride Time: 3.4 minutes/8.6 minutes Summer
Vertical Rise: 1,996 ft
Length: 3,447 ft
Towers: 10
Carriers: 58
Drive/Tension: Bottom
Design Speed: 1,000 fpm
Speed day of recording: 401 fpm
Filmed September 26 2026
SIDE NOTE: This is my first and only full loop video for 2026!