Last day of Rosanna-Heidelberg single track/Lwr Plenty Rd Level Crossing 16/3/18
Taitset
0:00 / 0:00
Last day of Rosanna-Heidelberg single track/Lwr Plenty Rd Level Crossing 16/3/18
4 512 просмотров · 8 лет назад
Taitset
63,8 тыс. подписчиков
4 512 просмотров · 8 лет назад
A view out the train window between Macleod and Heidelberg on 16/3/18, the last day of operations before the big six week shut down. Once trains return at the end of April, the new elevated Rosanna station will be built, the Lower Plenty Rd level crossing will be gone and there will be double track all the way to Heidelberg, passing through the new tunnel and over the new Burgundy St bridge.