Mumbai Pune Expressway Missing Link Project | October 2023 Progress
Jaideep Kane
0:00 / 0:00
Mumbai Pune Expressway Missing Link Project | October 2023 Progress
155 057 просмотров · 3 г. назад
Jaideep Kane
137 тыс. подписчиков
155 057 просмотров · 3 г. назад
The Mumbai Pune Expressway is presently of 6-lane cement concrete pavement with 2.5m wide paved shoulder on both sides having a length of 94 kms.
Mumbai Pune Expressway's 13.3 km 'Missing Link' project by MSRDC is an under construction 8 lane access-controlled highway with a route alignment connecting Khopoli to Kusgaon.
The link with a string of viaducts, tunnels and bridges aims to bypass Khandala Ghat's hairpin turns which are prone to landslides, reduce distance by 6 km, reduce travel time by 25 minutes, and provide a straighter route.
Dedicated Freight Corridor Maharashtra Update-
JNPT to Panvel- • Panvel to Vasai WDFC Progress | Part-1 | D...
Dedicated Freight Corridor Maharashtra Update-
Panvel to Kopar- • Panvel to Vasai WDFC Progress | Part-2 | D...
Dedicated Freight Corridor Maharashtra Update- Kopar to Vaitarna
• Kopar to Vaitarna WDFC Progress | Drone Sh...
Connect me on-
Twitter- / jaideepkane