Перейти к содержимому

The Most Implausible Part of Building Hoover Dam

Impossible Buildings

0:00 / 0:00

The Most Implausible Part of Building Hoover Dam

8 просмотров · 1 дн. назад
Impossible Buildings
4 подписчика
8 просмотров · 1 дн. назад
Hoover Dam could not be poured as one gigantic mass. The heat produced by curing concrete would have created dangerous thermal stress and long-term shrinkage. Engineers instead built the dam as thousands of separate blocks, embedded cooling-pipe networks inside the concrete, actively removed heat, and then pressure-grouted the cooled blocks together into one arch-gravity structure. Sources: U.S. Bureau of Reclamation — Hoover Dam Construction Chronology U.S. Bureau of Reclamation — Hoover Dam: Historic Views U.S. Bureau of Reclamation — Hoover Dam: Frequently Asked Questions and Answers — Tunnels, Towers, Penstocks and Spillways Bureau of Reclamation — Boulder Canyon Project: Final Reports, Part IV – Design and Construction Bureau of Reclamation — Boulder Canyon Project: Final Reports, Part IV – Design and Construction, Bulletin 3, Diversion, Outlet, and Spillway Structures Bureau of Reclamation — Hoover Dam: Fifty Years