Перейти к содержимому

Inside India’s Toughest Railway Project | Kottavalasa–Kirandul (KK) Tunnel 36 & 37 | Borra Guhalu

Life On Wheels Studios

0:00 / 0:00

Inside India’s Toughest Railway Project | Kottavalasa–Kirandul (KK) Tunnel 36 & 37 | Borra Guhalu

9 901 просмотр · 2 недели назад
Life On Wheels Studios
62,1 тыс. подписчиков
9 901 просмотр · 2 недели назад
We’re back on the Kottavalasa–Kirandul (KK) Line Doubling Project, one of the most challenging railway infrastructure projects being developed through the rugged terrain of the Eastern Ghats. 🚆🏔️ Check Out Update from Chimidipalli 🚇 Tunnel-28 & 29 🔗    • KK Line Doubling Project | New Tunnel Cons...   In the previous video, we explored the construction progress around Chimidipalli Railway Station, including Tunnel No. 28, Portal-02 & Tunnel No. 29, Portal-01. This time, we’ve moved further towards Borra Guhalu to document the latest progress at Tunnel No. 36 & Tunnel No. 37. The KK Line is approximately 445.5 km long, connecting Kottavalasa in Andhra Pradesh with Kirandul in Chhattisgarh via Koraput, Odisha. This important railway corridor plays a major role in transporting iron ore from the Bailadila region to Visakhapatnam & the East Coast ports. Chapters : - 00:00 - Introduction – KK Line Doubling Project 02:43 - Borra Guhalu Railway Station & DRA Base Camp 03:17 - The Challenging Approach Road 05:01 - Tunnel No. 37 – Construction Update 05:47 - Moving Towards Tunnel No. 36 06:20 - Monsoon Conditions at the Site 06:54 - Tunnel No. 36 – Construction Update 08:19 - Ananthagiri Hills of the Eastern Ghats Aerial View 11:00 - Final Thoughts The doubling project is creating a new railway line parallel to the existing operational track, involving multiple tunnels, bridges, deep cuttings & complex engineering structures. This section between Shivalingapuram & Borraguhalu covers around 27 km of challenging hilly terrain. The construction work is being executed by IRCON International & DRA Infracon as a Joint Venture. In this video, we’ll take you to the remote construction sites, show you the tunnel portals, ongoing excavation work, & give you a closer look at how these new tunnels are being developed inside the mountains. I’ll continue documenting this project through regular ground & drone visits, so that we can follow the transformation of this historic railway corridor as the new line takes shape. Watch till the end and let me know in the comments — should I also document the complete Visakhapatnam to Koraput train journey on this scenic route? 🚆🌿 #KKLine #KottavalasaKirandul #KKLineDoubling #IndianRailways #RailwayInfrastructure #RailwayConstruction #TunnelConstruction #Tunnel36 #Tunnel37 #BorraGuhalu #Chimidipalli #EasternGhats #Koraput #AndhraPradesh #Odisha #DRAInfracon #IRCON #RailwayDoubling #Infrastructure #IndianRailwayProjects #RailwayEngineering #Bailadila #Visakhapatnam