Special Machines & Robotic Assembly Lines Built Around Your Process | IOCCO – Made in Italy
IOCCO group
0:00 / 0:00
Special Machines & Robotic Assembly Lines Built Around Your Process | IOCCO – Made in Italy
32 просмотра · 12 дней назад
IOCCO group
58 подписчиков
32 просмотра · 12 дней назад
IOCCO designs and builds special machines, robotic assembly lines and turnkey production systems for general industry — engineered around your product and your process. From Cupello, Italy, to over 500 plants delivered on 4 continents.
Every product is different, and so is every process. Ours begins with yours: process analysis, mechanical, electrical and software design, in-house build and integration, PAT/FAT testing, commissioning, training and lifecycle support. Vision-guided robotics, automated assembly and screwing, traceable process data and AI-assisted operation — technologies chosen for the process, never the other way round.
In this video:
• Vision-guided picking and robotic assembly: surface preparation, primer, polyurethane adhesive and components, checked inline by vision
• Automatic gearbox assembly line: 18-second cycle, 3,000 parts a day on three shifts*
• Vacuum thermal processes designed by IOCCO: 25.9% less energy with the same process control; 8 systems in 4 countries saving over 8,000 MWh and about 2,700 t CO₂e a year**
• Our 4,000 m² Innovation Center with a 2,200 m² temperature-controlled workshop for full-scale testing, digital twin and virtual commissioning
KUKA Official System Partner · MATCH 4.0 · Abruzzo Aerospace District
CHAPTERS
0:00 Our story · 1978
0:21 Who we are
0:42 What we do: General Industry
1:08 500+ plants on 4 continents
1:23 Every process is different
1:39 Special machines & production lines
2:11 From product to production
2:38 Vision-guided robotic assembly
3:03 Automatic gearbox assembly · 18 s cycle
3:16 Vacuum thermal processes
3:31 Less energy, less CO₂
4:01 Technology and people
4:18 Innovation Center · Cupello
4:39 Full-scale testing & digital twin
4:55 Network & remote support
5:09 Engineering the future
Performance achieved in PAT and confirmed in FAT for the application described, under the project's test conditions.
** Annualised estimate based on six months of monitoring (353 days × 24 h); CO₂e from 2023 institutional emission factors; not a certified reduction.