CFA piling reaches the finish line on the Sturry Link Road project.
Episode 33 brings another huge week across the scheme, with the final four CFA piles installed at Pier 1, taking the viaduct works to 92 CFA piles.
But piling is only part of the story.
This week we also follow major concrete operations at Pier 2, Pier 4 and the South Abutment, watch pile cropping begin at the North Abutment, and see the temporary works taking shape ready to support construction of the South Abutment wing walls.
Then comes the end of an era as the piling rig leaves the project for the final time.
In this episode:
• Final four CFA piles installed at Pier 1
• CFA piling reaches 92 piles
• Final reinforcement cage installed
• Bachy begin demobilising from Platform B
• Pier 2 pile cap poured
• Pier 4 receives its first pile cap pour
• North Abutment excavation and pile cropping begins
• Diamond drilling starts on the North Abutment piles
• South Abutment temporary works take shape
• No fines concrete poured around the wing wall construction area
• More kerbs installed around the southern roundabout
• Attenuation pond continues towards its finished profile
• Full low level flight across the scheme to finish
Thanks as always for following the project.
If there’s something you’d like me to look at more closely or try to find out for a future episode, leave a comment below.
Subscribe to follow the Sturry Link Road project week by week.
#SturryLinkRoad #AerialWitness #civilengineering #construction #infrastructure #bridgeconstruction #canterbury