A Structural CRACK Shut Down This NEW TRAIN in 21 Days !
Open Roads
0:00 / 0:00
A Structural CRACK Shut Down This NEW TRAIN in 21 Days !
71 просмотр · 4 дня назад
Open Roads
56 подписчиков
71 просмотр · 4 дня назад
On June 3, 2021, passengers heading to Oslo Airport stepped onto a brand-new Norwegian express train, the Type 78, the first of eight ordered by airport rail operator Flytoget. Twenty-one days later, Flytoget announced that all eight were being taken out of service. No crash. No derailment. Just a crack found in a structural component during scheduled maintenance.
This documentary explains what sits underneath a passenger car, why one cracked bolster was enough to withdraw an entire new fleet as a precaution, how years of testing and authorization still didn't make a workshop inspection impossible, and why the cause of the crack has never been established in the public record.
It follows the fix: a redesigned bolster from manufacturer CAF, fatigue testing, installation on all eight trainsets in 2022, new authorization, and a return to passenger service on January 9, 2023, 564 days after the withdrawal announcement. The full fleet was only back in service in 2024.
Chapters:
00:00 A Brand-New Train, Pulled After 21 Days
01:02 Under The Passenger Car
01:46 The Fleet Is Pulled
02:44 What Was At Stake
04:34 Years Of Testing
05:53 Approval Is Not The Finish Line
07:05 What Caused The Crack?
08:07 Testing The Fix
09:23 Getting Back Into Service
10:45 The Cost Of The Wait
11:51 Twenty-One Days vs 564 Days
WATCH NEXT — Related documentaries:
The Bizarre Reason Your Train Tracks Are Painted White ?
• The Bizarre Reason Your Train Tracks Are P...
The 7 Most Dangerous Railways Ever Built
• The 7 Most Dangerous Railways Ever Built
Open Roads explains how extraordinary infrastructure is built, how it works and why it sometimes fails.
SUBSCRIBE:
/ @open-roads-travel
#Trains #Documentary #Engineering