Перейти к содержимому

Blatigue 2 – Sebastiaan van Putten on wind turbine blade testing

Blatigue-2

0:00 / 0:00

Blatigue 2 – Sebastiaan van Putten on wind turbine blade testing

29 просмотров · 13 дн. назад
Blatigue-2
29 просмотров · 13 дн. назад
Can wind turbine blade testing be sped up? Yes, says Sebastiaan van Putten, development engineer at DTU Wind’s Large Scale Facility at Campus Risø. Certifying a long blade means bending it up and down one million times, at roughly one cycle per second. That adds up to about a year of testing, so every possible speed-up matters. In one of the final test campaigns in Blatigue-2, the DTU team is trying “segmented tests”. They cut the tip off the blade and attach a carbon spring underneath it. Combined with other project results, this could cut testing time from a year, depending on blade length, to a matter of months. That gets blades to market faster, but certainty matters as much as speed. The team has also studied “cross-talk”, converting measured strain into bending moments. They tested different calibration methods to produce valid cross-talk matrices, which is of interest to both industry and science. To check that the approach scales, the work runs at two sizes. DTU is testing a 12.6-metre blade cut down to about 9.5 metres, while partner Blaest tests a much larger blade with a considerably bigger spring. If the results match, Sebastiaan is confident the method can speed up testing of wind turbine blades and of any other structure that vibrates.