I-885 - BOTH Directions - Durham - North Carolina - 4K Highway Drive
Mileage Mike Travels
0:00 / 0:00
I-885 - BOTH Directions - Durham - North Carolina - 4K Highway Drive
17 154 просмотра · 4 года назад
Mileage Mike Travels
93,5 тыс. подписчиков
17 154 просмотра · 4 года назад
The long-awaiting Interstate 885 in Durham, NC is FINALLY open. This video is a drive of both the northbound and southbound directions of the new highway. Passing through the major employment area, Research Triangle Park, NCDOT claims this highway will save Durham area commuters around 10 minutes of travel time.
Filmed: July 2022
Cities Explored: https://www.google.com/maps/d/edit?mi...
Follow on Instagram: / mileagemike
Make a one time donation to support the channel:
https://cash.me/$milmike
Equipment Used:
SD Card: https://amzn.to/38ikIb6
Tripod: https://amzn.to/3vH1xQh
Camera: https://amzn.to/3Kdfx9E
Camera Mount: https://amzn.to/3vSX2m0
Computer: https://amzn.to/3EVZNaj
External HD: https://amzn.to/3vI8zUW
Glass Cleaner: https://amzn.to/3EWIQg1
Tablet: https://amzn.to/3vrLffx
Tablet Accessories: https://amzn.to/3FcmRBT
Smartphone Gimbal: https://amzn.to/3wPx2d0
Covert Camera: https://amzn.to/3xvRr7h
Headphones: https://amzn.to/3MBcJEF
DISCLAIMER: This video and description contains affiliate links, which means that if you click on one of the product links I’ll receive a small commission. This helps support the channel and allows me to bring you more videos in more places. Thank you for the support!
From Wikipedia:
Interstate 885 (I-885) is a freeway linking I-40 in Research Triangle Park and I-85/US 15 in Durham. Its first appearance was on August 19, 2014, when the October project letting was released, which included I-885 in the sign plans.
The Interstate begins at I-40/Durham Freeway interchange (exit 279B), then goes north along the former route of NC 147 to the East End Connector, a newly built roadway to bridge the short gap between NC 147 and US 70. Continuing north concurrently with US 70, it ends at the I-85/US 15/US 70 interchange (exit 178). The NC 147 designation was removed from the existing route south of the interchange with the new connector, and the exits of the rump NC 147 (leading northwest into downtown Durham) have been renumbered to reflect its truncation. The route between I-40 and I-885, encompassing the segment no longer designated as NC 147, the new connector itself, and the segment of existing US 70 that leads to I-85, are designated I-885 and its exits renumbered accordingly. The East End Connector began construction in March 2015, and opened to traffic on June 30, 2022.
Time Stamps:
Northbound: 0:00
Southbound: 8:30