Fired Heater Foundation Survey & Civil Handover | 04/30

Oil and Gas Construction

0:00 / 0:00

Fired Heater Foundation Survey & Civil Handover | 04/30

5 просмотров · 9 дней назад
Oil and Gas Construction
51 подписчик
5 просмотров · 9 дней назад
Check the foundation datum, levels and geometry before steelwork arrives at the base. Session 04/30 — Civil Handover and Foundation Survey. Check civil completion, establish coordinates and levels, survey pedestals and anchors, assess base and grout conditions, and release foundations with measurable evidence. WHAT THIS LESSON EXPLAINS • Define the foundation handover boundary • Establish a reliable survey reference • Set out centreline and orientation • Survey each pedestal as built • Check anchor rods and their pattern • Separate concrete, baseplate and grout levels • Inspect concrete and prepare the grout surface • Verify erection access and ground support • Issue the dimensional report • Perform the final pre-erection walkdown PRACTICAL REVIEW CHECKS • Define the civil handover boundary, including central and auxiliary supports. • Review concrete acceptance, strength and anchor installation records. • Verify the survey benchmark, coordinate system and final pavement datum. • Confirm heater centreline and plan orientation. • Record each pedestal's position, top geometry and elevations against approved tolerances. CHAPTERS 00:00 Define the foundation handover boundary 00:56 Establish a reliable survey reference 01:49 Set out centreline and orientation 02:44 Survey each pedestal as built 03:37 Check anchor rods and their pattern 04:29 Separate concrete, baseplate and grout levels 05:20 Inspect concrete and prepare the grout surface 06:18 Verify erection access and ground support 07:10 Issue the dimensional report 08:06 Perform the final pre-erection walkdown COURSE RESOURCES Watch the complete ordered course:    • Fired Heater Installation & Commissioning ...   Download the complete 175-page PDF guide: https://drive.google.com/file/d/1bKVc... PDF-guide companion: the final bonus video in the ordered playlist above. Training reference: field work requires approved drawings, method statements, permits, vendor instructions and inspection releases. Lifting, weld settings, test pressures, refractory mixing/curing/dryout values and purge/ignition settings must come from the approved equipment documents. Illustrations are explanatory and do not authorize field work. Audience: construction personnel, supervisors, inspectors, technicians and commissioning teams. #FiredHeater #OilAndGasConstruction #Commissioning