Melt Flow Indexer Operation | English Touchscreen, Testing & Cleaning
Qiantong Testing Instruments
0:00 / 0:00
Melt Flow Indexer Operation | English Touchscreen, Testing & Cleaning
8 просмотров · 13 дн. назад
Qiantong Testing Instruments
4 подписчика
8 просмотров · 13 дн. назад
Learn how to operate the English touchscreen on the Qiantong melt flow indexer shown in this video. The demonstration covers setup, sample loading, timed cutting, weighing the cut segments, entering the average mass, cleaning, and printing a test record.
For laboratory operators and quality teams, the video shows how the touchscreen steps connect with the work at the barrel, die, and collection tray.
What you will see:
Prepare the tools and weights.
Set up the English interface and heating.
Install the die, load the sample, and start the preheat timer.
Check the extruded strand and adjust the cutting interval.
Weigh the cut segments and enter their average mass.
Review the result, clean the instrument, and print the record.
Operating note: Use the settings and cleaning method specified for your instrument and material. The demonstration values are examples.
Chapters:
00:00 Tools and weights
00:22 Power on and English touchscreen setup
01:17 Install the die
01:41 Prepare and load the sample
02:37 Preheat timer and additional weight
02:52 Determine the cutting interval
03:58 Run the test and adjust the interval
05:31 Weigh segments and enter average mass
06:15 Remove material and clean the piston
07:12 Remove and clean the die
07:55 Clean and inspect the barrel
08:49 Print the record and shut down
Need help with equipment selection or operator training? Send your material, required test standard, test temperature and load, and destination country.
Suzhou Qiantong Instrument Equipment Co., Ltd.
Website: https://www.qiantongtest.com/
Email: hugh@qiantongyiqi.com
#MeltFlowIndex #PolymerTesting #Qiantong