Train Cab Ride NL / Utrecht - Nijmegen - Roosendaal - Vlissingen / Four Provinces / March 2024
Machinist Stefan
0:00 / 0:00
Train Cab Ride NL / Utrecht - Nijmegen - Roosendaal - Vlissingen / Four Provinces / March 2024
61 731 просмотр · 2 года назад
Machinist Stefan
29,1 тыс. подписчиков
61 731 просмотр · 2 года назад
Hi everyone! A little late but it's time for a 261km ride! We start the ride in Utrecht at the dawn of day. The sun will start shining soon. You'll get to see the just re-opened modernized station Ede-Wageningen. We have a first timer in this video for the route Nijmegen to 's-Hertogenbosch. I added extra information to the route Roosendaal to Vlissingen.
0:00 Utrecht Centraal
3:02 Utrecht Vaartsche Rijn
5:59 Bunnik
9:04 Driebergen-Zeist
13:39 Ecoduct
14:38 Maarn Goederen
15:12 Maarn
18:20 De Haar connection
21:09 Veenendaal-De Klomp (Province Border)
Today we'll run through the Provinces Utrecht - Gelderland - Noord-Brabant and Zeeland!
24:31 Ede-Wageningen
This station has been upgraded. What do you think of the new look of Ede-Wageningen?
30:50 Wolfheze
32:28 Oosterbeek
34:34 Arnhem Centraal
In Arnhem we must change direction to head back towards Nijmegen.
39:32 Spoorbrug Oosterbeek
40:34 Arnhem Zuid
41:20 De Notenlaan brug
Awesome looking bridge don't you think? :D
42:26 Elst
42:56 Ressen connection
45:33 Nijmegen Lent
46:08 Spoorbrug Nijmegen
47:05 Nijmegen
After arrival at this station we change trains. This part of the journey has been never shown on my channel. Have fun!
52:37 Nijmegen Goffert
53:43 Nijmegen Dukenburg
55:49 Wijchen
57:29 Single Track towards Edithbrug (Province Border)
This route has a short part that has just a single track. We'll pass the Edith Bridge. And there's also a long temporary speed limit in place.
1:00:43 Ravenstein
1:03:39 Requesting Green Lights at Oss
Time to get back on schedule!
1:06:18 Oss
1:09:48 Oss West
1:14:25 Rosmalen
1:16:04 ‘s-Hertogenbosch Oost
1:17:46 ‘s-Hertogenbosch
Arriving with just a small delay on 's-Hertogenbosch.
1:24:23 Vught connection
1:33:01 Tilburg Industrie
1:34:53 Tilburg connection
1:36:05 Tilburg
Still an awesome looking roof! :D
1:39:44 Tilburg Universiteit
1:41:36 Tilburg Reeshof
1:43:42 Gilze-Rijen
1:48:07 Breda
At Breda we have a 5 minute stopover. This because leaving here earlier would cause a 5 minute stop just before Roosendaal since the train in the opposite direction will depart there from our arrival platform just before we arrive.
1:56:39 Breda connection
2:00:34 Etten-Leur
2:11:09 Roosendaal
Change of trains again. Now to the route towards Vlissingen. Shown about 1.5 months ago for the first time on my channel. This time the temporary speed limits are gone. And the weather will be much better than the last time we drove here. Also I added a lot of extra info in the video compared to last time!
2:14:05 Varkensneus MS75
The train on the left is coming from Belgium. In Dutch we call it the 'Varkensneus' (Pig Nose).
2:17:43 Old Locomotive on the Right
Some history planted on the right side of the tracks! :D
2:19:07 Kragge connection
2:21:07 Bergen op Zoom
2:25:20 Longest Dutch Curved Rail (Province Border)
Here's the longest Dutch Rail Curve we have. Almost two minutes before we'll reach the end of it.
2:28:00 Kreekrakspoorbrug
2:30:18 Rilland-Bath
2:33:22 Dijkcoupure
On this route you'll see a lot of Dijkcoupures. These dikes can be shut for trains and water. The doors of the dikes will be closed in case of a water emergency and sand bags will be placed for extra support and strength. Zeeland has a lot of them all mentioned in the video.
2:34:48 Dijkcoupure
2:35:20 Krabbendijke
2:38:28 Dijkcoupure
2:39:10 Dijkcoupure
2:40:40 Kruiningen-Yerseke
2:43:00 Dijkcoupure
2:44:00 Vlakebrug
No power lines available at this bridge. We must shut down the motors just before passing it.
2:46:20 Kapelle-Biezelinge
2:48:05 Contact Train Dispatcher
It takes a long time before the level crossing is responding. Just as I call the dispatcher it already starts working. We have a small delay on departure.
2:51:15 ATB Track Failure
Unfortunately we still have some ATB failures on this route. As soon as we get to it we report this back to the train dispatcher as well.
2:51:58 Goes
2:53:25 Contact Train Dispatcher
2:54:05 Stoomtrein Goes-Borsele
On the left you can see the starting station for the steam line Goes - Borsele (museum trains).
2:56:10 Dijkcoupure
2:59:48 Lewedorp (connection)
3:01:10 Arnemuiden
3:04:20 Arnemuiden Spoorbrug (ATB Track Failure and small Dijkcoupure)
3:06:22 Dijkcoupure
3:07:12 Middelburg
3:08:20 Contact Train Dispatcher
3:11:25 Vlissingen Souburg
3:14:17 Vlissingen
After a long ride we reach Vlissingen at almost the end the of morning. I hope you enjoyed the ride! Let me know what you think of it and have a good weekend! :D Cheers!
The Meaning of Signals
https://wetten.overheid.nl/BWBR0017707/
More Ride Info
https://treinposities.nl/ritinfo/2024...
https://treinposities.nl/ritinfo/2024...
https://treinposities.nl/ritinfo/2024...
Want More? Check out my other Socials!
/ machiniststefan
https://www.threads.net/@machiniststefan
https://bsky.app/profile/machinistste...