Pakaw for 6mx8m 48sqm poste sa baba standard finish sa second floor
FOREMAN BUDDY
0:00 / 0:00
Pakaw for 6mx8m 48sqm poste sa baba standard finish sa second floor
1 150 просмотров · 3 недели назад
FOREMAN BUDDY
7,91 тыс. подписчиков
1 150 просмотров · 3 недели назад
Estimated materials cost:
Item
Cost
Concrete Materials
₱125,000
Reinforcing Steel
₱95,000
CHB & Mortar
₱45,000
Roofing Materials
₱75,000
Formworks
₱40,000
Total Structural Materials:
≈ ₱380,000–₱430,000
LABOR;
Para sa 6m × 8m elevated concrete house (48 sqm) na may:
Ground floor open
Elevated concrete slab
2 bedrooms, 1 CR
4" CHB walling
Shed roof
Ang pakyaw labor ay
karaniwang nasa:
Scope
Presyo
Structural lamang
(footing, columns, beams, slab)
₱120,000 – ₱160,000
Structural + CHB walling
₱160,000 – ₱230,000
Structural + walling + roofing
₱230,000 – ₱310,000
Kung foreman-contractor package (labor only) ang usapan, ang madalas kong nakikitang reasonable na pakyaw para sa ganitong bahay ay:
₱280,000 – ₱330,000
Complete labor hanggang finishing (walang materials)
₱320,000 – ₱510,000
Kasama:
excavation, rebars,
formworks, concreting,
CHB laying, plastering,
roofing.
Hindi kasama:
electrical materials,
plumbing materials,
pintura, tiles, fixtures,
at permit fees.
With labor, electrical,
plumbing, doors, windows,
ceiling, and finishes:
humigit-kumulang
=₱1.0M–₱1.4M depende
sa kalidad ng finish at labor
rates sa inyong lugar.
SUBSCRIBE FOR MORE