Pakaw for 6mx8m 48sqm poste sa baba standard finish sa second floor

FOREMAN BUDDY

0:00 / 0:00

Pakaw for 6mx8m 48sqm poste sa baba standard finish sa second floor

1 150 просмотров · 3 недели назад
FOREMAN BUDDY
7,91 тыс. подписчиков
1 150 просмотров · 3 недели назад
Estimated materials cost: Item Cost Concrete Materials ₱125,000 Reinforcing Steel ₱95,000 CHB & Mortar ₱45,000 Roofing Materials ₱75,000 Formworks ₱40,000 Total Structural Materials: ≈ ₱380,000–₱430,000 LABOR; Para sa 6m × 8m elevated concrete house (48 sqm) na may: Ground floor open Elevated concrete slab 2 bedrooms, 1 CR 4" CHB walling Shed roof Ang pakyaw labor ay karaniwang nasa: Scope Presyo Structural lamang (footing, columns, beams, slab) ₱120,000 – ₱160,000 Structural + CHB walling ₱160,000 – ₱230,000 Structural + walling + roofing ₱230,000 – ₱310,000 Kung foreman-contractor package (labor only) ang usapan, ang madalas kong nakikitang reasonable na pakyaw para sa ganitong bahay ay: ₱280,000 – ₱330,000 Complete labor hanggang finishing (walang materials) ₱320,000 – ₱510,000 Kasama: excavation, rebars, formworks, concreting, CHB laying, plastering, roofing. Hindi kasama: electrical materials, plumbing materials, pintura, tiles, fixtures, at permit fees. With labor, electrical, plumbing, doors, windows, ceiling, and finishes: humigit-kumulang =₱1.0M–₱1.4M depende sa kalidad ng finish at labor rates sa inyong lugar. SUBSCRIBE FOR MORE