Перейти к содержимому

Masaka-Kyotera-Mutukula Road: 89.5 km Under Construction | Aerial Progress Documentary

AFROBIM

0:00 / 0:00

Masaka-Kyotera-Mutukula Road: 89.5 km Under Construction | Aerial Progress Documentary

7 066 просмотров · 1 мес. назад
AFROBIM
793 подписчика
7 066 просмотров · 1 мес. назад
Aerial progress documentary on the reconstruction of the Masaka-Kyotera-Mutukula Road (89.5 km), together with the Nyendo-Villa Maria Road (11 km) and 7 km of access roads. Filmed by drone from mobilisation through earthworks, drainage structures, bridge construction and priming of the base layer. Construction commenced in July 2024 under a four-year contract. Contractor: M/s Chongqing International Construction Corporation (CICO). Engineer: Ministry of Works and Transport In-house Supervision Team. Chapters 00:00 Introduction 00:12 Mobilisation: camp, borrowpit, asphalt plant and quarry 00:58 Existing road condition, Mutukula border to Masaka 01:58 Mutukula Roadside Station at km 85+500 02:38 Drainage: box culvert construction 03:23 Bridge construction at km 69+400 04:20 Earthworks: road bed, side drains and rockfill 05:59 Sub-base, base layer and priming 06:43 Credits What you'll see: camp establishment at km 38+500, material borrowpit at km 29+500, asphalt concrete plant and quarry set-up, existing carriageway conditions through Kalisizo and Kyotera town, the roadside station and medical centre at km 85+500, box culverts at km 22+000, km 38+000, km 42+600 and km 56+000, pile foundations and girders at the km 69+400 bridge, rockfill through swamp sections, G45 sub-base and CRR base processing, and priming ahead of surfacing. Aerial footage and edit: [your credit]. Narration and score produced in-house. #UgandaRoads #MasakaMutukulaRoad #civilengineering