Lahore Orange Line Train Phase 2 | The Raiwind Road Extension | Sun LO
Sun Lo
0:00 / 0:00
Lahore Orange Line Train Phase 2 | The Raiwind Road Extension | Sun LO
2 825 просмотров · 2 ч назад
Sun Lo
74,2 тыс. подписчиков
2 825 просмотров · 2 ч назад
Lahore Orange Line Train Phase 2 | The Raiwind Road Extension | Sun LO
Lahore is losing 100 Billion PKR a year to traffic gridlock, but a brand new 5KM extension to the Orange Line Metro Train is about to change the city's future. Welcome to Phase 2 of the Lahore Mass Transit Master Plan!
👇 SUBSCRIBE FOR MORE MEGA PROJECTS! 👇
In this documentary, we explore the brand-new Lahore Orange Line Phase 2 extension stretching from the Ali Town Terminal directly into the heart of the Raiwind Road corridor. With South Lahore expanding rapidly through massive housing societies and universities, the Thokar Niaz Baig traffic jam has become a nightmare. This new 5-kilometer, 4-station track is the ultimate masterstroke of the 2026-2030 Punjab Mass Transit Masterplan.
We break down the incredible engineering behind Pakistan's first driverless mass rapid transit system—funded under CPEC—including its 100-year U-Shape concrete viaducts, the 750V DC power grid, and the hidden underground heritage bypass at Mall Road. We also uncover the financial reality: why the government pays a Rs. 151 subsidy per ticket, and what the future holds with the upcoming Blue Line, Purple Line, and Yellow Line projects!
🏗️ PROJECT STATS COVERED:
• Track Extension: 5 Kilometers (4 New Stations)
• Design Life: 100 Years
• Existing Network: 25.4km Elevated, 2 Underground Stations
• Power System: 750V DC Third Rail System
• Ridership: 260+ Million Passengers in 5 Years
• Safety Record: Zero Accidents (Operated by GMG, Norinco, Daewoo)
#SunLo #OrangeLineTrain #Lahore #OrangeLine #MegaProjects #PakistanInfrastructure #CPEC #LahoreMetro #CivilEngineering #RaiwindRoad #UrbanPlanning #MassTransit