The Day After Demolition (Transpennine Route Upgrade)
On Track With Tim
0:00 / 0:00
The Day After Demolition (Transpennine Route Upgrade)
9 083 просмотра · 1 месяц назад
On Track With Tim
2,75 тыс. подписчиков
9 083 просмотра · 1 месяц назад
Just 24 hours after Demolition Saturday, we return to the TransPennine Route Upgrade to see what has changed across some of the most dramatic engineering sites in West Yorkshire.
This follow-up begins at the Baker Viaduct East Abutment, where embankment works continue to rise towards the new alignment. From there, we revisit Baker Viaduct itself, looking at the completed steel structure, ongoing concrete deck installation and the wider grade-separation works taking shape nearby.
Attention then turns to Calder Road Bridge, where the former structure has now been removed. With virtually no trace of the old bridge remaining, the space created for the future railway alignment is far clearer, and engineers can continue stabilising the embankment and preparing the route for the next stages of construction.
The final section revisits Colne Bridge Road Bridge, another structure removed during the previous day’s major possession. Its curved replacement is now fully visible, while the cleared railway formation shows how much additional space has been created for the future fast lines and overhead line equipment.
This video documents the immediate aftermath of one of the busiest demolition weekends on the TransPennine Route Upgrade and shows how quickly the landscape can change in just 24 hours.
Subscribe to On Track With Tim for regular documentary-style updates following bridge construction, railway engineering, electrification, fast-line installation and major developments across the TransPennine Route Upgrade.
Chapters
00:00 Intro
00:30 Baker Viaduct East Abutment
01:15 Baker Viaduct
04:00 Calder Road Bridge
06:25 Colne Bridge Road Bridge
#TransPennineRouteUpgrade #TRU #BakerViaduct #CalderRoadBridge #ColneBridgeRoad #RailwayEngineering #BridgeDemolition #Huddersfield #Dewsbury #RailwayConstruction #NetworkRail #OnTrackWithTim