Mau Rironi Highway: HUGE Bridge & Heavy Construction from Nyambare to Viewpoint | EPISODE 3
Kelvin Murithi KE
0:00 / 0:00
Mau Rironi Highway: HUGE Bridge & Heavy Construction from Nyambare to Viewpoint | EPISODE 3
1 174 просмотра · 11 дней назад
Kelvin Murithi KE
1,23 тыс. подписчиков
1 174 просмотра · 11 дней назад
The Mau Rironi Highway construction journey continues! This is Episode 3 of my ongoing series documenting the progress of this massive road project section by section.
In this episode, I start from Nyambare, a busy shopping centre where a huge concrete bridge is taking shape. I get a close look at the massive round concrete pillars, along with the large reinforcement bars forming part of the structure.
From there, I continue walking towards Viewpoint, passing through an area filled with heavy construction activity.
Along the way, I encounter:
🚧 Tipper trucks bringing in soil
🚜 An excavator loading soil onto a tipper
💪 A bulldozer breaking through a hard layer of soil
🏗️ A sheep-foot roller compacting a newly prepared section
🛣️ A grader shaping and levelling the soil
🏭 A concrete mixing station producing materials for prefabricated blocks
🚛 Tippers delivering fine ballast to the concrete mixing station
🌉 Completed drainage structures and underpasses along several sections
As I continue walking, the scale of the project becomes even clearer, and towards the end of the video I can see Viewpoint in the distance.
This series isn't just about seeing the highway once. I will be returning to the areas covered in Episodes 1, 2 and 3 to follow the construction and see how much has changed over time.
📍 Nyambare → Viewpoint
🛣️ Mau Rironi Highway
🎥 Episode 3
If you're following this project, subscribe and follow the series because there's still a lot more road to cover.
#MauRironiHighway #Nyambare #Viewpoint #Limuru #Kenya #RoadConstruction #HighwayConstruction #KenyaInfrastructure #ConstructionUpdate #RoadDevelopment #BridgeConstruction #4KWalk